Trains on the UK’s High Speed 2 railway, which is currently under construction, will operate to an average delay target of 30 seconds, North Wales Pioneer said in a report on 19 July.
HS2 Ltd., the line’s builder, said trains that operate on the line will rival Japan’s shinkansen trains, famed for their dependability and punctuality.
The HS2 line initially will run from London’s Euston Station to Birmingham Interchange, with future extensions to Leeds and Manchester already having been proposed.