It will be installed in a primary substation and connected to an 11kW grid as part of Toshiba’s ongoing commitment to promoting such systems around the world.
The storage system project, to be located in Wolverhampton, West Midlands, will allow testing at what Toshiba describes as realistic levels, to ascertain its technical and economic potential within the grid.